Home
Activities
Athletics
Attendance Policy
Bell Schedule
Calendar
Campus Map
Career Center
Cashee Resources
Clubs
Conduct/Discipline/Rules
Counseling

District Wide Beliefs
Dress Code
Driving Directions
E.S.L.R's
Fine Arts
Grad Night
Important Dates
Library
Music
Past Bulletins
School Loop
School Objectives
School Parameters
Single Plan
Student Standards
Student Handbook
Tactics
Teachers/Staff
Valuable Links
Will C. Wood the School
Will C. Wood the Man
Wood Post


Will C. Wood High School
998 Marshall Road
Vacaville CA, 95687

Phone: (707) 453-6900
Fax: (707) 451-3656

Principal:
Chris Strong

Assistant Principals:
Suzanne Weisker
Bill Ewing

Kathy Farros-Hoepner

Dean of Learning Support:
Gricelda Rodriguez

Athletic Directors:
Mark Wudel

Activities Director:
Steve Cuckovich

WCW HISTORY


Wood first opened its doors in September of 1969. At that time it was planned to be Vacaville’s second comprehensive high school. Growth was not as fast as anticipated and plans were modified. From 1969 through 1973 Wood was a satellite campus for Vacaville High School. Ninth and tenth grades for science and math and all classes for ninth graders were two combinations that were used. In the fall of 1974, Wood became a junior high school (grades 7 - 9) servicing the south side of Vacaville and Willis Jepson Junior High School serviced the north side of Vacaville. Wood remained in this format until the 1988-1989 school year. 

A new intermediate school, Vaca Pena Intermediate School, was built on the south side of Vacaville. Seventh graders went to Vaca Pena rather than to Wood. In 1988 Wood began its transition to a four-year high school. That year Wood had 8th, 9th, and 10th graders. Construction was started to complete Wood as a high school. A new gymnasium, locker room, classroom wing, office complex, cafeteria, and theater were added. Each year a new class was added. The 1991 - 1992 school year was the first year that Will C. Wood was a complete four year high school. However, the facility was never completed. 1992 was our first graduating class.

In 2007-2008, Will C. Wood begins a three phase modernization process. This is a 35 million dollar project funded by the Measure V Bond initiative passed in 2003.  The first phase of this project includes a new lower field complex that will improve our physical education facility as well as enhance our ability to hold athletic events on campus. Will C. Wood will be able to use the facility for athletics and school activities.

The second phase of the project is the addition of a state of the art science wing. This will be a two story building that will add valuable classroom space as well as provide our students and staff with a science facility that we can all be proud of. 

And finally, the third phase of the project will include many upgrades to our quad and current teaching stations as well as in improvement of our technology infrastructure and boys locker room.
           

Wood has had a total of six principals:

Nancy Klees              1969  -  1977     
Fran
k Molina             1977  -  1991
Mike Donnoe             1991  -  1994
Garlon Prewitt            1994  -  1995
Enriqueta Newland    1995  -  2005

Chris Strong               2006  -  current